The barrier works at the Brent Cross Interchange have been completed with a bespoke solution from Asset-VRS.

The Interchange, opened in 1976, required additional protection to substandard barriers on both the inner ring and extra protection to the flyovers bridge piers, which form part of the articulated structure.

Barry Warren, a Works Manager for FM Conway’s Structures Division, praised the team at Asset VRS for their bespoke design, work ethic, and professionalism during the works’ implementation, especially their compliance within the constraints imposed due to the COVID restrictions, confirming, “They are a pleasure to work with, being both a professional and reliable team.”

Following the initial barrier works on the inner ring at the Mid-Levels of the Interchange, where bespoke Zoneguard now offers the primary protection in front of the original substandard parapet,  Asset VRS installed additional custom Zoneguard sections to the off slips and at the Mid-Levels roundabout, to protect the bridge piers.

Designing and installing four acute barrier sections, maintaining the barriers flow around the bridge structures, Barry complimented the installation team, explaining how “following the first evenings’ effort, the team confirmed a more efficient installation method. Following discussion, this was implemented successfully on the second evening.” Anthony Wright, Project Engineer at Asset VRS, added, “Being able to create bespoke barrier solutions for projects like Brent Cross can be both fascinating and challenging. Great teamwork and full customer engagement throughout all of our projects enable us to deliver protection to ageing and iconic interchanges across the network.”

Barry finished by confirming he had worked with the teams previously, and he looks forward to hopefully working together again on future projects.

 

 

Other case studies

M1 J10-13 Smart Motorway Upgrades

Supply and installation of temporary vehicle restraint systems (VRS), enabling a central reservation upgraded on one of the UK’s business motorways corridor

BBV M42 Corridor HS2

HS2 is the UK’s largest infrastructure project, designed to improve connectivity between London, the Midlands, and the North. Along the M42 corridor – a critical section intersecting with the…

Iconic Interchange Protected with Vehicle Restraint System

The barrier works at the Brent Cross Interchange have been completed with a bespoke solution from Asset-VRS.

Road barriers protect medieval Peak District bridge – and its appearance

Asset VRS was selected by Jackson Civil Engineering to install a suitable vehicle restraint system (VRS) on the bridge, as part of the Environment Agency scheme.

M5 Exeter Road Safety Barrier

Varioguard protecting both road workers and passing traffic on the M5 near Exeter

A45 Birmingham Airport Flight Pass Protected

Protecting road workers and passing traffic under the Birmingham airport flight pass

M5 Worcester Central Reservation Works

Fully tested to EN1317: N2 W3, N2 W4, N2 W5, N2 W6 and H1 W6 Varioguard can be installed using the Asset Drilling Rig, providing ZERO Hand Arm Vibration, with…

M6 Junction 21a Manchester Zoneguard and Rebloc

Zoneguard and Rebloc barriers protecting road workers and the passing public on the M6 by Junction 21a Manchester.