The Challenge: Upgrading the M5 Central Reserve

Highways England (now National Highways) manages the strategic road network in England. When steel central reserve barriers reach the end of their working life, its policy is to replace them with concrete barriers on motorways and very busy dual carriageways.

Concrete barrier systems are highly robust and designed to safely redirect errant vehicles and prevent them breaking through in a collision. In summer 2019, Highways England began upgrading the central reserve barrier between Junctions 24 and 25 of the M5 in Somerset – a busy route linking the Midlands and the South West, used by thousands of motorists every day.

Temporary concrete barrier in the central reservation on the M5

Temporary concrete barrier in the central reservation on the M5

The Solution: REBLOC RB84XEAL_8 Concrete Barrier

As a multi-award-winning manufacturer and supplier of concrete roadside safety barriers, Hardstaff was appointed by Highways England contractor Barrier Services to provide the barrier system.

The REBLOC RB84XEAL_8 permanent precast concrete vehicle restraint system was installed along the 6.5km stretch. Tested to EN 1317, it has a high containment performance class of H2 and can safely contain and redirect a 13-tonne bus travelling at 80km/h and impacting at 20 degrees.

The system forms a high-strength continuous chain that safely transfers energy and impact forces, and was installed with integrated drainage channels so water can drain through the barrier.

Concrete barrier protecting a gantry leg as traffic queues on the M5

Concrete barrier protecting a gantry leg as traffic queues on the M5

Built Around Existing Structures

REBLOC RB84XEAL_8 was ideal for this scheme because it could deviate around and protect existing structures in the central reserve, and serve as a foundation for matrix signs. It also connected easily to the existing steel barrier at the end of the run.

For added safety, two Steel Step Barriers were installed to provide emergency crossing points. With a rapid-opening bi-directional gate, extremely low deflection and high containment, the Steel Step Barrier is ideal for emergency access points between concrete barrier systems.

Close-up of the steel connector joining two barrier units

Close-up of the steel connector joining two barrier units

The Outcome

Thousands of motorists using the M5 between Junctions 24 and 25 are now protected from barrier breakthroughs, and Highways England has been able to follow its policy of replacing ageing steel central reserve barriers with concrete. Hardstaff was an integral part of the Highways England and Barrier Services team throughout, joining collaborative meetings during the scheme.

Barrier Services highlighted the cost and programme benefits of the system.

“The REBLOC RB84XEAL_8 precast concrete barrier enabled the designers to create a hybrid centre reserve. The existing drainage system was used to avoid the cost of fully hardening the centre reserve. The barrier requires a low ground bearing capacity, so it can be installed onto 200mm of asphalt or concrete, reducing ground preparation and scheme cost. Our team installed over 700m of barrier in a four-hour working window, reducing time on site, exposure and risk.”

Dan Raffles, Director, Barrier Services

Key Facts

  • 6.5km of REBLOC RB84XEAL_8 installed between Junctions 24 and 25 of the M5
  • H2 containment, tested to EN 1317
  • Integrated drainage allowing water to pass through the barrier
  • Installs onto 200mm of asphalt or concrete thanks to its low ground bearing requirement
  • Two Steel Step Barriers providing emergency crossing points