Steel and concrete temporary road barrier solutions and vehicle attenuator systems for use on the UK’s road network.
Fully tested to EN1317: N2 W3, N2 W4, N2 W5, N2 W6 and H1 W6 Varioguard can be installed using the Asset Drilling Rig, providing ZERO Hand Arm Vibration, with up to 3000m drilled and fixed per shift.
Varioguard, installed in preparation of central reservation works to protect road workers and passing traffic on the M5 near Worcester.
Available with connections to an unmatched containment level choice of barriers, including Rebloc and Zoneguard, Varioguard makes up part of the UK’s largest temporary barrier rental pool.
Our UK based rental pool is available for scheduled works or emergency requirements. It offers an unmatched containment level choice, as well as fenced solutions and gated options, enabling us to provide the perfect end-to-end solution for your temporary works scheme.
Get in touch today to find out more.
Great Yarmouth’s Third River Crossing parapet, barrier and railing system
Development, Manufacture and Installation of Bespoke Pedestrian and Vehicle Parapets, Barriers, Guard Rails on Herring Bridge, Great Yarmouth’s Third River Crossing
A27 Shopwyke – Delivering a Complex Barrier Solution
The A27 Shopwyke project, completed in May 2024, involved the installation of a concrete barrier to protect the piers of a footbridge situated at the edge of a busy…
Enhancing Traffic Management at Oxford Station Expansion with SentriGate
Four strategically positioned SentriGates took over the entrances, exits, and vital checkpoints around the Junction of Botley Road and Cripley Road, a crucial traffic point. Under the vigilance of…
A303 Plant Crossing – SentriGate Case Study
Following advice from leading vehicle restraint system (VRS) experts at Hardstaff Barriers, it was decided that a physical barrier would also be used in addition to the traffic signals.…
Iconic Interchange Protected with Vehicle Restraint System
The barrier works at the Brent Cross Interchange have been completed with a bespoke solution from Asset-VRS.
M6 All Lanes Running (ALR) Project
The pre-painted red and white Multibloc TVCB were installed 4.3m from the running face of the temporary studs and the line of the traffic in the central reserve as…
Road barriers protect medieval Peak District bridge – and its appearance
Asset VRS was selected by Jackson Civil Engineering to install a suitable vehicle restraint system (VRS) on the bridge, as part of the Environment Agency scheme.
Protecting The Queen’s Funeral with Bridge Protection
Mourners who visited Queen Elizabeth II’s funeral and paid their respects in Westminster were protected from the threat of vehicle-borne attacks thanks to years of meticulous planning and one…