Asset’s Varioguard vehicle restraint system is an important traffic management safety product adopted by Costain and regularly used on highway contracts as part of their supply chain agreement.   

Junction 34 on the M6 Lancaster is undergoing extensive alteration with two motorway slip roads on each North and South bound sections being replaced with two new wider routes as part of the Heysham to M6 link project.  Part of a much bigger Lancaster re-generation plan, the old slip roads first had to be removed whilst still allowing motorway access during the construction of the new routes alongside.

Varioguard installed alongside Lancaster Road for M6 Link Project

Varioguard is the leading highway safety barrier system on the UK market. It is fully tested to BS EN 1317 performance levels N1, N2 and H2. Different working width classes are available, dependent on anchorage configurations. When used as a temporary safety barrier Varioguard is usually anchored at each end with four 500 mm long anchor pins into pre-drilled holes.

With work proceeding along both sides of the M6 motorway, Varioguard was removed and repositioned as work progressed. The hard shoulder and lane one were closed off to motorway traffic, enabling construction vehicles and site workers to move safely within the job remit.

Varioguard was identified as an ideal solution for such a vast project due to fulfilling one of Costain’s key priorities; allowing workers to operate safely, efficiently and responsibly by ensuring they operate in an environment free from harm. Their values ensure everyone at Costain is committed to being safe and environmentally aware, two points that can be attributed to Varioguard. Made of galvanised steel Varioguard is durable and long lasting, this vehicle restraint system is extensively tested at different performance levels, with test lengths that reflect lengths of need.

   Varioguard installed alongside Lancaster Road for M6 Link Project with van driving past    Varioguard installed alongside Lancaster Road for M6 Link Project with lorry driving past

Other case studies

Iconic Interchange Protected with Vehicle Restraint System

The barrier works at the Brent Cross Interchange have been completed with a bespoke solution from Asset-VRS.

Road barriers protect medieval Peak District bridge – and its appearance

Asset VRS was selected by Jackson Civil Engineering to install a suitable vehicle restraint system (VRS) on the bridge, as part of the Environment Agency scheme.

M5 Exeter Road Safety Barrier

Varioguard protecting both road workers and passing traffic on the M5 near Exeter

A45 Birmingham Airport Flight Pass Protected

Protecting road workers and passing traffic under the Birmingham airport flight pass

M5 Worcester Central Reservation Works

Fully tested to EN1317: N2 W3, N2 W4, N2 W5, N2 W6 and H1 W6 Varioguard can be installed using the Asset Drilling Rig, providing ZERO Hand Arm Vibration, with…

M6 Junction 21a Manchester Zoneguard and Rebloc

Zoneguard and Rebloc barriers protecting road workers and the passing public on the M6 by Junction 21a Manchester.

A14 Huntingdon – Temporary Vehicle Restraint System

The Asset VRS’s range of barriers was used extensively across the scheme; in some weeks the project utilised almost every temporary barrier product within the range, from the Zoneguard…

Zoneguard Vehicle Restraint System – M6 J16-19 Smart Motorway

The narrow 700mm foot of the barrier enables a wider working area for construction staff, plant and vehicles operating behind the steel barrier. This additional work area width is…