Hill & Smith Infrastructure, BmJV and their delivery partners introduced a pioneering approach to installing central reserve rigid concrete barrier (RCB) across two major schemes on the Strategic Road Network.
The projects supported the SMP Alliance’s goal of moving construction off-site to improve safety, efficiency and programme certainty.
At the M40–M42 Interchange, the team trialled and delivered a new RCB system using precast foundations and surface-mounted H2 concrete barriers.
The approach was refined and scaled up for the M42 J4–7 Dynamic Hard Shoulder Enhancement, where a newly developed low-carbon H1 barrier was introduced. Designed to integrate seamlessly with the H2 system, it contributed to a carbon saving of 129,760 kg CO₂e.
These projects show the impact of early engagement, collaborative learning and off-site innovation in delivering safer, faster and more sustainable outcomes across the UK’s road network.
Download the full case study below to see how Hill & Smith Infrastructure delivered innovative barrier systems while adapting to complex site conditions, streamlining off-site construction and working closely with stakeholders.