M1 J10-13 Smart Motorway Upgrades
Supply and installation of temporary vehicle restraint systems (VRS), enabling a central reservation upgraded on one of the UK’s business motorways corridor
BBV M42 Corridor HS2
HS2 is the UK’s largest infrastructure project, designed to improve connectivity between London, the Midlands, and the North. Along the M42 corridor – a critical section intersecting with the…
A27 Shopwyke – Delivering a Complex Barrier Solution
The A27 Shopwyke project, completed in May 2024, involved the installation of a concrete barrier to protect the piers of a footbridge situated at the edge of a busy…
Enhancing Traffic Management at Oxford Station Expansion with SentriGate
Four strategically positioned SentriGates took over the entrances, exits, and vital checkpoints around the Junction of Botley Road and Cripley Road, a crucial traffic point. Under the vigilance of…
A303 Plant Crossing – SentriGate Case Study
Following advice from leading vehicle restraint system (VRS) experts at Hardstaff Barriers, it was decided that a physical barrier would also be used in addition to the traffic signals.…
M6 All Lanes Running (ALR) Project
The pre-painted red and white Multibloc TVCB were installed 4.3m from the running face of the temporary studs and the line of the traffic in the central reserve as…
Protecting The Queen’s Funeral with Bridge Protection
Mourners who visited Queen Elizabeth II’s funeral and paid their respects in Westminster were protected from the threat of vehicle-borne attacks thanks to years of meticulous planning and one…
Historic M1 footbridge protected thanks to installation of world-first road barrier
The historic bridge needed increased protection in the event of a collision, but limited space at the roadside meant there were few options available. Following the launch of Rebloc’s…