Project Overview

The A27 Shopwyke project, completed in May 2024, involved installing a concrete barrier to protect the piers of a footbridge at the edge of a busy roundabout. Hill & Smith Infrastructure was awarded the contract, another successful project for long-standing client Newton & Frost.

The Challenges

The scheme presented some very specific challenges, which all partners overcame through meticulous planning and collaborative working.

A27 at Shopwyke, with the footbridge and the new concrete barrier protecting its piers

A27 at Shopwyke, with the footbridge and the new concrete barrier protecting its piers

Accommodating Existing Footpaths

The site, on the edge of a busy roundabout, needed careful consideration of existing footpaths. The layout had to keep pedestrian access open, without obstructing the paths during or after installation.

Designing for Different Verge Specifications

The eastern and western verges each had their own requirements:

  • Eastern verge: a concrete-only barrier.
  • Western verge: a more complex solution with a curved section and a short length of steel N2 vehicle restraint system (VRS) at the departure end, supplied by Hill & Smith Infrastructure.
A27 Shopwyke junction with concrete barrier at the edge of the carriageway

A27 Shopwyke junction with concrete barrier at the edge of the carriageway

The Solution

Through collaborative working and Hill & Smith Infrastructure’s end-to-end delivery, from initial barrier drawings through to installation, the team developed a range of solutions to the scheme’s challenges.

Installing the RB185A REBLOC Barrier

The solution used the RB185 REBLOC barrier. It is the world’s first extensively tested, fully EN 1317-compliant precast concrete safety barrier with the highest containment level, H4a, and a working width of W1. The RB185 also has a vehicle intrusion rating of VI2 and needs a footprint of just 0.8 metres.

Concrete barrier protecting a footbridge pier on the A27 at Shopwyke

Concrete barrier protecting a footbridge pier on the A27 at Shopwyke

Planning and Collaboration

Input from the Hill & Smith Infrastructure drawing office and technical department was crucial in tailoring the solution. The barriers were designed shorter, at 2.33 metres long with extended couplers, to follow the curved radius and allow more room for movement and turning.

Seamless Installation

Preparing the Verges

  • Eastern verge: new sections of concrete verge infill created level ground for the concrete units.
  • Western verge: because of the designed kerb radii, special shorter concrete units were designed to follow the curve. The whole radius was built in the concrete RB185 product, with patented end couplings made to connect to the steel barrier.

Efficient Delivery

  • Delivered through collaboration between Hill & Smith Infrastructure, Newton & Frost, Landbuild and MJA Architects.
  • Completed in just two shifts per side, reducing traffic management costs.

Compliance and Safety

  • Both approach ends were fitted with QuadGuard crash cushions to protect the H4a barrier ends.
  • The Design Manual for Roads and Bridges standard CD 377 was strictly followed, ensuring compatibility between the steel, concrete and temporary barriers used.

Early Engagement and Collaboration

Hill & Smith Infrastructure invested significant time from the outset, including several meetings and involvement at the design stage, which helped the client avoid unnecessary costs and delays:

  • Early engagement: being involved at the design stage meant potential issues were identified and solved before they could affect the programme or budget.
  • Collaboration: working closely with all parties ensured every requirement and constraint was understood and built into the design.
  • Design expertise: detailed, accurate drawings and specifications made the final solution both effective and efficient.
  • Experience: knowledge from similar projects led to solutions that met the scheme’s specific needs.

The work was completed over two visits, with the concrete units installed first, followed by the steel barrier on the western verge.

The Outcome

The A27 Shopwyke project shows the value of tailored solutions and careful planning for complex sites such as busy roundabouts and structures with very limited space for protection. Find out more about our work in the highways sector.

Newton & Frost were pleased with the result:

“We are extremely pleased with the results of the recent project completed by Hill & Smith Infrastructure. The meticulous planning and bespoke design of the RB185 REBLOC barrier ensured that the installation was both efficient and effective. The collaboration between Hill & Smith Infrastructure and all partners was outstanding, and the final installation exceeded our expectations.”

Phil Jones, Estimator, Newton & Frost

“We are proud to have successfully completed this project with efficiency and precision. Our end-to-end delivery, coupled with the outstanding collaboration between Hill & Smith Infrastructure and our partners, ensured a seamless and successful installation. We are delighted that our efforts resulted in a highly satisfactory outcome for our client, demonstrating our commitment to excellence and innovation in road safety solutions.”

Sarah Compton, Highways Account Manager, REBLOC

Published on: 17/05/2024
Updated on: 31/10/2026

Download the Full Case Study

Fill in the form below to download the PDF.

Download Shopwyke Case Study PDF

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Email*
By completing the above and submitting your details, you consent to receive communications from Hill & Smith Infrastructure with more information about how we can help your business. You can unsubscribe at any time through the links in our marketing emails.