Fully tested to EN 1317: N2 W3, N2 W4, N2 W5, N2 W6 and H1 W6 Varioguard can be installed using the Asset Drilling Rig, providing ZERO Hand Arm Vibration, with up to 3000m drilled and fixed per shift.
Varioguard was installed ahead of central reservation works on the M5 near Worcester, protecting road workers and passing traffic throughout the scheme.

Traffic on the M5 near Worcester alongside the protected central reservation works
Varioguard is fully tested to EN 1317 at N2 W3, N2 W4, N2 W5, N2 W6 and H1 W6, giving a wide choice of working widths to suit the space available in the central reserve.
It can be installed using the Asset Drilling Rig, which gives zero hand-arm vibration for operatives and allows up to 3,000m to be drilled and fixed per shift.

Varioguard protecting the M5 central reservation works
Varioguard connects to an unmatched choice of containment levels, including REBLOC and Zoneguard, and forms part of the UK’s largest temporary barrier rental pool.
Our UK-based rental pool is available for scheduled works and emergency requirements, with fenced and gated options, so we can provide a complete end-to-end solution for each temporary works scheme.

Varioguard in place as traffic flows on the M5 near Worcester
The central reservation works were completed with the workforce protected from live traffic and the M5 kept running throughout. Find out more about our work on the strategic road network on our highways page.

Traffic passing the Varioguard barrier on the M5