Stansted Airport

As a trusted supplier of temporary airside barriers and protection products, Hardstaff was appointed by VolkerFitzpatrick to install a BlastDefender fencing system around the construction site to protect the workforce behind…

Bath Christmas Market

Bath Christmas Market is one of the UK’s most popular festive events, featuring food and gift stalls across the city’s pretty Georgian streets. The award-winning event, which took place…

Multibloc TVCB Hinkley Point

The Hinkley Point C Park and Ride facilities at Bridgwater, Junction 24 on the M5, include parking for 620 cars and bus parking facilities. It also offers a freight…

Birmingham Christmas Market 2019

Birmingham’s annual Christmas Market is the largest authentic German market outside of Germany and Austria and is the pride of Birmingham’s annual event calendar. Having started in November 2001,…

Eastbourne Air Show 2019

The Eastbourne Air Show is the UK’s largest, free air show. The event takes place across 4 days every August and includes Battle of Britain memorial flights as well…

A14 Huntingdon – Temporary Vehicle Restraint System

The Asset VRS’s range of barriers was used extensively across the scheme; in some weeks the project utilised almost every temporary barrier product within the range, from the Zoneguard…

Multibloc TVCB M6 J16-19

Multibloc TVCBs provide a new method of access and egress delineation into the central reserve.

Zoneguard Vehicle Restraint System – M6 J16-19 Smart Motorway

The narrow 700mm foot of the barrier enables a wider working area for construction staff, plant and vehicles operating behind the steel barrier. This additional work area width is…

Varioguard Severn Bridge Suspension Cable Inspection – Vehicle Restraint System

The Asset Vehicle Restraint System (VRS) is tested to BS EN 1317-2:1998 containment level H2. Galvanised steel elements lock together to make a rigid, energy-absorbing barrier where errant vehicles…

Varioguard Heysham to M6 Link Project

Asset’s Varioguard vehicle restraint system is an important traffic management safety product adopted by Costain and regularly used on highway contracts as part of their supply chain agreement.

MASS Barrier Worcester Ringway

Ringway’s highway division was awarded the contract to install a new roundabout system to improve traffic flow close to Worcester’s historic cathedral. The roundabout being installed following a major…

MASS Barrier Manchester Metrolink 2

The Victoria Station sections phases I.II and IIICC is the fifth section of the multi-billion pound Manchester Metrolink that MASS has been used to provide carriage and footway safety…

MASS Barrier Manchester Metrolink 1

As part of the temporary traffic management Laing O’Rourke are using MASS barrier to delineate the works, and to segregate and protect both road users and the workforce. Although…

MASS Barrier System Exhibition Road

Balfour Beatty Regional Civil Engineering (BBRCE) has been commissioned to reconstruct this public thoroughfare to create an outdoor space that better accommodates the needs of both pedestrians and transport,…

MASS Barrier Temporary System Birmingham New Street Station

Working with contractors and project managers at Birmingham New Street Station a bespoke MASS system was designed and fabricated enabling the station regeneration to commence safely. Birmingham New Street…

MASS Barrier System Heysham Costain

MASS (Multi Application Safety System) was chosen by main contractor Costain for Lancashire County Council, to provide increased operational safety to pedestrians, site workers and traffic during the construction…

Overnight Installation of Asset Zoneguard A14 Kettering

Asset VRS, one of the Hill & Smith Plc. group of companies, recently completed their first UK installation of Zoneguard temporary steel barrier on the Kettering A14 stretch of…